![Stormwater Drainage Project](https://i0.wp.com/survwest.com/wp-content/uploads/2021/09/20210602_120749.jpg?resize=1024%2C576&ssl=1)
This project consisted of SUE investigations in two residential areas. All surveying was performed for the collection of SUE field data. Investigative services QL-D and QL-B were performed as part of this stormwater drainage project. QL-A testholes were completed to the tight vertical clearance to help ensure the proper clearances were maintained during construction. 17th & Dellwood. (utility coordination, permitting coordination, project management)